Bar Beer Brewing Equipment

Pub brewery equipment
11/28/2019
500L Bar beer brewing equipment
11/28/2019

300L beer equipment with direct fire heating

Bar Beer Brewing Equipment Configuration

Items Equipment Specification Quantity
Malt miller Malt miller 300Kg/hour 1
Brewhouse system Mash tun&lautering tun 500L 1
Brew kettle&whirlpool 500L 1
Hot liquid tank 500L 1
Plate heat exchanger 6m² 1
Pump 3m³/h 1
Wort oxygenator 1
Fermentation system Fermenter 500L 6
Yeast adding tank 20L 1
Cooling system Glycol water tank 1000L 1
Refrigerator 5hp 1
Pump 3m³/h 1
CIP washing system Alkali tank 100L 1
Sterilization tank 100L 1
Pump 3m³/h 1
Control system Siemens PLC control box/Digital display 1
Spare parts All the necessary spare parts 

 

Fermentation Unit

Interior wall stainless steel 304, 3mm exterior wall stainless steel 304 or copper, 2mm
Dome top, top manway with glass Side manway, cone bottom 160 degree
insulation: polyurethane/rockwool 100mm with inside CIP washing ball
sparging arm, sight glass raking agitator
Tangential inlet for whirlpool removable false bottom
Thermowell for temperature sensor and thermometer. All the necessary spare parts, like valves, gaskets, clamps

Brewhouse Unit

Interior wall stainless steel 304, 3mm exterior wall stainless steel 304, 2mm
3 legs with adjustable bolts Glycol cooling jackets on both cylinder and cone
Insulation: polyurethane 100mm Inside 360 degree rotating CIP washing ball
sample valve, rotating racking arm on cone
dry hop port on top safety&vacuum valve
Inside polishing 0.4- 0.6 micron automatic pressure relief
thermowell,pressure  sensor&gauge

Dome top, conical bottom, top mounted manway

 

 

Cooling Unit

Insulated glycol water tank with or without copper coil for glycol liquid holding and mixing
Efficiency chillers or refrigerators with fryonto supply cooling energy
Sanitary centrifugal pump for glycol water recycle among tanks and heat exchanger
All pipes, fitting, insulation materials are included

Controlling Unit

Electrical controlling cabinet with temperature, on-off controlling for brewhouse
Electrical controlling cabinet with temperature, on-off controlling for cooling parts
Temperature controller, thermocouple, solenoid valves etc are included

PLC with touch screen panel for special request

Controlling Unit

 

china-brewery-equipment

According to customer requirements to provide one-stop brewing beer project solution: tailored process flow chart; site layout; cost-benefit analysis.
Our expert staff will assist with the assembly of your brew house on site, and consult on the placement of related equipment.
We will ensure that all questions and concerns are addressed during the setup of your new equipment.
Our commitment to all tanks five-year warranty, life-long technical support. And send professional brewing engineers free on-site guidance to install debugging; to teach brewing beer brewing technology; provide a variety of brewing brewing formula; supply all kinds of beer brewing raw materials.
We have Trade Assurance granted, it’s seen as Buyer Protection.
Order quality protected, payment safety, timely shipment; 100% of assurance amount refundable.
We provide follow-up support on all of our equipment as well as answering questions about your process on our systems.
You can log onto our website for information, or mail/call us anytime. We welcome your questions and feedback.
Our commitment to all tanks five-year warranty, life-long technical support. And send professional brewing engineers free on-site guidance to install debugging; to teach brewing beer brewing technology; provide a variety of brewing brewing formula; supply all kinds of beer brewing raw materials.